Guide 01
Choosing a lifting capacity
Crane capacity is quoted at a specific radius, not at the boom tip. A crane rated at
12 tonnes may only lift a fraction of that once the load is several metres away from
the truck. Buyers who compare only the headline number usually end up with a crane that
cannot do the job on site.
Start from the job, not the chart
- Measure the heaviest single load you will lift, including rigging and slings.
- Measure the distance from the crane centre to where that load sits on site.
- Check the height you need to clear, and whether the boom will be stowed under obstacles.
- Confirm ground conditions — outrigger spread and ground bearing often decide feasibility.
Knuckle boom or telescopic boom
Knuckle (folding) booms stow compactly, reach around obstacles and suit low-clearance
sites and lift-and-carry work. Telescopic booms give longer reach and faster extension
for straightforward lifts. If your work mixes both, tell us the split — the chassis and
body need to be planned around it.
Chassis and payload
The crane, body and payload compete for the same gross vehicle weight. A larger crane
on the same chassis means less cargo capacity. Confirm the total weight you intend to
carry on the road, not just the weight you intend to lift.
See crane trucks
Guide 02
20GP or 40HQ: how vehicles ship
Commercial vehicles usually move in containers or as break-bulk cargo. The choice
changes cost, protection and how much dismantling is needed before loading.
Container shipping
- The vehicle is partially disassembled — mirrors, ramps and sometimes the crane boom are removed.
- Loading and securing are planned in advance; a stowage plan is part of the documentation.
- Containers protect the vehicle from weather and handling damage in transit.
- More than one unit per container lowers the per-unit freight cost.
Break-bulk and RoRo
- Suited to vehicles too large to containerise, or when reassembly on arrival is not practical.
- Freight rates vary more, and port handling can add cost.
- Confirm the receiving port handles the vessel type and equipment.
What to send us
Destination port, number of units, model and whether you can accept a partially
disassembled unit. With those three answers we can quote both methods and let you
compare landed cost rather than freight rate alone.
Ask for a shipping quote
Guide 03
Documents that clear customs
A truck that arrives without the right paperwork can sit at port accruing storage
charges. Ask for the full set with your quotation, not after the vessel sails.
Standard set
- Commercial invoice and packing list, consistent with the sales contract.
- Bill of lading, issued after the container is loaded.
- Certificate of origin, in the form required by your destination agreement.
- Conformity documents — COC or CE files where the market requires them.
Market-specific
- Some markets require pre-shipment inspection by a nominated agency.
- Some require the importer to register the product before shipment.
- Emission and safety standards may need to be declared on the invoice or certificate.
Common delays
- Invoice value and description not matching the customs declaration.
- Chassis number or engine number differing between documents.
- Certificate of origin issued after the shipment date, when the destination requires otherwise.
Tell us the destination country at the quotation stage. We list the document set for
that market and flag anything you must arrange locally.
Request a quote